13 Nisan 2014 Pazar

Pin up week



Master plan 2

In the first picture you will see the area separation with the domes. Geodesic dome structures contained in this 4-story elevator is made out to be used. https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEiVdet-MSxbV34NyAwktTWN5yEp2ruozXhLid6OEM9g2xfOj2n1iqlS-6ApNgHWC-xi5rAVjNg8q86HcYUeroQu5RyIhQA2syPplKzAHvHNiERowiUdyd-BKv6Qt1a1zOPZi9jla8VPqHU/s1600/20140331_005106.jpg

In the second picture the function of this structure is located. From the top left to right; retired people and waste-to- energy production , health, space, water collection and farming area, rain water collection and purification centers and the entrance and the exit of the main building, which provided by 2 buildings and wave energy collection center, various technical centers . At the bottom row from left to right; solar panels and waste material recycling center, meat production farms and laboratories, a training center. Each dome has a door at the entrance. The door is shutting down immediately in any danger so the danger is staying in the dome. Between the center domes they are using the transportation vehicles such as bicycles but usually not needed. 

Pink places are housing just for the employees who works in that area. The yellow areas are for entertainment purposes; gym, theater, etc.